WebMCP in production|INEMA.CLUB-PRO

In this lesson you will

  1. 1The course map in four steps
  2. 2The report with the seven checks
  3. 3How to bring the kit to your site
  4. 4The maintenance plan with dates

Goal: combine the seven checks into a dated report for your site and leave with the maintenance plan for when the spec changes.

01The course map

Four steps and what each one delivers. Click an exercise to see its "done when".

Day 1Three doors

one rule

4 exercises

Screen, WebMCP, and MCP answering the same.

See the lesson
Day 2Battery

frozen

4 exercises

24 checks in four modes.

See the lesson
Day 3Watch

API that changes

3 exercises

Base saved and watch running.

See the lesson
Day 4Report

your site

3 exercises

RELATORIO-AAAA-MM-DD.md with 7/7.

See the lesson
At the end of the trackA site with tools on the page and on the server, the same without the API, with battery, watch, catalog, and report.
26 exercises
Click an exercise to see what to do and the "done when".
  1. 1/4

    Three doors

    The base: one rule imported by the page and the server, with the person confirming at all three doors.

  2. 2/4

    Battery

    Requires step 1. Contract and cases with a hash; the old-name regression catches it.

  3. 3/4

    Watch

    Requires step 2. The source changed: battery, reading, fix.

  4. 4/4

    Report

    Requires all three. Approved catalog, log, and your site's report.

Layers, log, neighbors, and governance (lessons 1, 3, 5, and 7) go into the report and the generator below.

02The report

Runs the seven checks (lessons 1 to 7) and writes relatorio/RELATORIO-AAAA-MM-DD.md. It takes about 2 minutes: it opens Chromium several times.

Terminal · final report
cd ~/projetos/formacao-webmcp-expert-v72/kit
node scripts/relatorio.mjs; echo "saída: $?"
Example from the repository
ok    Camadas (aula 1) · CAMADAS: 8/8 com evidência
ok    Uma ação, três superfícies (aula 2) · SUPERFÍCIES: 3/3 iguais na busca · 3/3 reservas esperaram a pessoa
ok    Registro de chamadas (aula 3) · REGISTRO: 8 chamadas · ok 3 · erro 1 · recusado 2 · cancelado 1 · pediu-pessoa 1 · dado pessoal no registro: não
ok    Bateria congelada (aula 4) · BATERIA: 24/24 ok
ok    Protocolos vizinhos (aula 5) · VIZINHOS: 8 protocolos · 8 decisões · 0 problema(s)
ok    Vigia da spec (aula 6) · VIGIA: 7/7 iguais à base · nada a fazer
ok    Governança (aula 7) · GOVERNANÇA: 0 problema(s)
RELATÓRIO: 7/7 verificações ok → relatorio/RELATORIO-2026-10-19.md
saída: 0

The watcher is the only check that depends on the network. Without a network, it exits with 3 and the report marks "sem conclusão", not "ok".

03Take the kit to your site

In order. Each step has the script that proves it.

1. Rule

Pull your site's logic off the screen into a module with no DOM, like oficinas.mjs.

The page and the server import this module. Proof: superficies.mjs.

04Practice

The kit's report, your site's report, and the plan.

E1 · The kit's report

5 min

Run the final report and open the file it generates.

Done when: node scripts/relatorio.mjs; echo "saída: $?" → RELATÓRIO: 7/7 verificações ok → relatorio/RELATORIO-[today's date].md and saída: 0.

E2 · Your site's report

3 h

In a copy of the kit, follow the four steps above with your site. Use DECISOES=vizinhos/meu-site.json so the report reads your decisions.

Done when: In your copy, DECISOES=vizinhos/meu-site.json node scripts/relatorio.mjs; echo "saída: $?" → RELATÓRIO: 7/7 verificações ok and saída: 0.

E3 · Maintenance plan

10 min

Generate the plan below and add the dates: next watcher run, end of the origin trial (Chrome 156), and next review of the neighbor decisions.

Done when: You downloaded the plan (.md or .ics) and it has the three dates.

05Generate your plan with dates

Pick a start date and how much time you have per week.

06Lesson quiz

The explanation appears after the answer.

Question 1 of 4

The report came out 6/7: the watch marked "sem conclusão". What does that tell you?

07In three sentences

ProjectPage, server, battery, log, watch, and catalog, proven by a dated report.
Your siteRule in one module, thin doors, frozen cases, and operations with an owner.
MaintenanceThe spec will change: watch, battery, reading, and report again.

The complete WebMCP Track