PTENES
MODULE 2.3

📊 Map the process

A diagram explains in 5 seconds what text can’t explain in 5 paragraphs. Here, you learn to draw the flow using minimal notation, compare as-is with to-be, find bottlenecks, map decisions, mark where AI comes in, and validate everything with the client before building.

6
Topics
40
Minutes
Basic
Level
Practical
Type
1

🔣 Simple flow notation

You don’t need full BPMN. Three symbols handle 95% of processes: rectangle for one step, diamond for one decision and arrow for the direction of the flow. Simple enough for anyone to understand.

Step rectangle Decision diamond Data → arrow = direction

💡 Practical tip

Start with pencil and paper. A hand-drawn diagram made in 10 minutes is worth more than a perfect BPMN that nobody finishes.

Rectangle
A step / action
Diamond
Yes/no decision
Cylinder
Data warehouse
Arrow
Flow direction
2

🔄 As-is vs. to-be

Draw two flows side by side: the as-is (how it works today, full of manual steps) and the to-be (what it will look like with AI, streamlined). The visual contrast is the most convincing proof of value — the client sees the steps that disappear.

AS-IS · today extract copy format review send 5 steps · ~52 min TO-BE · with AI AI processes delivery 2 steps · ~30 s

✗ As-is (current)

  • ✗Too many manual steps and screen changes
  • ✗Waiting and rework along the way
  • ✗Long cycle time, high cost

✓ To-be (future state)

  • ✓Manual steps eliminated or combined
  • ✓AI handles classification, extraction, and generation
  • ✓Cycle time in seconds, low cost
As-is
Current state
To-be
Future vision
Contrast
Prove the value
Difference
= the gain
3

🧱 Find bottlenecks and rework

With the as-is mapped out, the problems become obvious. Bottleneck is the slowest step, which limits the whole process. Rework is a correction loop that could have been avoided. Both are the areas with the highest returns.

1

Mark the slowest step

The bottleneck

That’s where the queue forms. Speeding it up speeds up the entire process.

2

Look for arrows that loop back

The rework

Correction loops indicate that something was done wrong earlier. Fix the cause, not the symptom.

3

Find the wait times

Dead time

Waiting for approval or for someone else is usually the biggest cause of a long cycle time.

💡 Practical tip

Addressing the bottleneck yields more than optimizing any other step. Improving a step that isn't the bottleneck doesn't speed anything up.

Bottleneck
Slowest step
Rework
Correction loop
Waiting
Dead time
Root cause
Solve the root cause
4

🌿 Decision points and branches

Every process branches at some point: approved or rejected, type A, B, or C. These decision points need to be mapped carefully—each branch must have a clear destination, and the conditions must be mutually exclusive.

Request Value > R$ 5 mil? yes manager approval no approves automatically

⚠️ Attention

A decision without a complete exit branch becomes a bug in the automation. Make sure that todo the path has a destination — including "none of the options".

Decision
≥2 outputs
Branch
Clear Destination
Exclusive
No overlap
No loose ends
Every branch ends
5

🤖 Where AI fits in the diagram

Not every step needs AI. Mark only the nodes where it really shines in the to-be: language (classify, extract, summarize, generate) and diffuse judgment. Fixed rules? Use regular logic — it's cheaper and more reliable.

✓ AI shines at

  • ✓Classify free text (emails, tickets)
  • ✓Extract data from unstructured documents
  • ✓Summarize, translate, and generate text
  • ✓Making decisions with diffuse context

✗ Don’t use AI to

  • ✗Calculations one formula can handle
  • ✗Fixed rules like "if A, then B"
  • ✗Move data from one field to another
  • ✗Decisions that require exact precision

🏷️ Mark the intelligent nodes

In the to-be diagram, highlight the AI steps with a distinct color or icon. That makes it clear where the automation’s “brain” is—and where it’s just plumbing.

[AI] classify → [logic] routes → [AI] generates a response
Language
Where AI shines
Judgment
Diffuse context
Common logic
Fixed rules
Mark nodes
[AI] visible
6

✅ Validate the diagram with the client

Before writing a line of automation, sit down with someone who knows the process and validate the diagram. Fixing a design takes minutes; fixing a finished automation takes days. The right question is "is this right?" — not "shall I build it?".

🔍 Validation plan

  • •Go through step by step with whoever executes it.
  • •Ask about exceptions that were missing from the design.
  • •Confirm the to-be: does the proposed future state make sense?
  • •Define the scope: validated diagram = agreement on what will be built.

💡 Practical tip

Treat the validated diagram as a visual contract. It aligns expectations and protects you from change requests that "were always in scope."

Go through
Step by step
Exceptions
What was missing
Confirm
Does the to-be make sense?
Scope
Deal closed

🔑 Key concepts of the module

notation = rectangle · diamond · arrow
value = as-is − to-be
focus = bottlenecks + rework + waiting
decision = branches with destinations · exclusive conditions
AI = language + judgment (the rest = ordinary logic)

📊 Module Summary

✓
Minimal notation is enough - rectangles, diamonds, and arrows cover 95% of cases.
✓
As-is vs. to-be - visual contrast is the proof of value.
✓
Bottlenecks and rework - the highest-return points; tackle the bottleneck.
✓
Well-mapped decisions - every branch has a destination, with mutually exclusive conditions.
✓
Mark where AI comes in - language and judgment; the rest is ordinary logic.
✓
Validate before building - validated diagram = agreed scope.

Next Track:

Track 3 · Solution Design — from the mapped process to the blueprint: architecture, tools, models, and logic.