MODULE 5.2

📊 Business and task graphs

Module practical: take your growth funnel and your team’s backlog—things you already have—and draw both as graphs. Writing them down exposes feedback loops, constraints, and bottlenecks that the org chart hides.

6
Topics
45
Minutes
Practical
Level
Hands-on
Type
Progress in this module
0%0 of 6
1

🌱 Model the funnel as a graph

Take the funnel you already have in mind: campaign, traffic, landing page, signup, activation, retention, LTV, churn. Each one becomes a at the — a state the client passes through. Each arrow is the conversion rate between one state and the next: what percentage leave one node and reach the next.

🆕 New here? Four terms before you continue

  • CAC (customer acquisition cost): how much you spend, on average, to acquire a new customer — add up what went to the campaign and divide by the customers who came in.
  • LTV (lifetime value): how much revenue a customer generates in total while they keep paying.
  • Activation: the moment when a new customer uses the product for real for the first time — they didn’t just sign up, they did the thing that proves its value.
  • Retention / churn: retention is the share of customers who stay; churn is the opposite — the share who cancel or disappear.

Just writing out this queue of nodes often exposes a problem: someone always realizes they've never measured the rate between two specific stages—usually between "signup" and "activation," where most products lose people without anyone noticing. Naming the node forces you to admit that number doesn't exist.

Whiteboard-style diagram of the growth funnel: budget leads to a campaign, which leads to traffic, then to a landing page, signup, activation, retention, and LTV. Churn branches off from retention. CAC is connected to activation. A dashed line connects LTV and CAC, labeled LTV divided by CAC greater than 3. A red loop goes from LTV/churn back to the campaign, labeled a better campaign leads to lower churn, which leads to higher LTV.
What to look at: the focus here isn’t the row of boxes — it’s the red line looping back and the dashed line connecting LTV to CAC. The row by itself is just a pipeline. Those two extra lines are what make it a graph, and they’re the subject of the next two topics.

Key concepts

Node = state

Stage the customer goes through

Edge = rate

Conversion between two states

Writing exposes

A stage with no measured rate appears

Starting point

A funnel is still a pipeline

2

🔄 Mark the feedback edges

Two edges go back to the beginning of the funnel, and they are what give the system behavior of its own. The first: the customer who cancels (churn) becomes data that changes the campaign — you look at who canceled and adjust who you advertise to. The second: CAC informs the decision about how much budget the campaign gets in the next cycle.

🆕 New here? Feedback

Feedback: when the output of a process influences its own input. In the graph, it’s an edge that leaves from further ahead and loops back to a previous node — the same cycle you saw in Track 1, but now with business metrics at both ends.

🎯 Why this matters

This is the feedback loop that gives the system behavior of its own — and it’s exactly what a short-sighted agent, looking at just one metric (for example, “lower CAC”), doesn’t see. It cuts the campaign budget, CAC drops in the report, and no one notices that the cheaper audience also has higher churn — LTV collapses three months later.

✓ Feedback clearly marked

  • ✓"Churn updates the profile of who NOT to advertise to"
  • ✓"This month's CAC feeds into next month's budget cap"
  • ✓The edge has a label saying WHICH data comes back and WHERE it goes

✗ Feedback ignored

  • ✗Design the funnel only as a straight queue, from campaign to LTV
  • ✗Optimize CAC without checking what happens to churn/LTV
  • ✗Treating each metric as if it were independent of the others

Key concepts

Churn feeds back

Becomes data for a campaign

CAC feeds back

Becomes data for a budget

Own behavior

The cycle is what brings the system to life

Nearsighted agent

Only sees what you pointed out

3

⚖️ Declare the Constraints Between Metrics

"LTV divided by CAC needs to be greater than 3" isn't a metric—it's a relationship between two. You can't write this as a number that goes up or down on its own: it's a comparison that only exists when both nodes are in the same graph, with an edge declaring the rule between them.

A loop with a single objective — "lower CAC," "increase conversions" — can’t even express this constraint, the more you respect it. This is the most concrete argument for modeling a business as a graph: constraints between metrics only make sense when both metrics are visible nodes at the same time, connected by an edge that carries the rule.

LTV CAC ⚖️ LTV / CAC > 3 constraint — it's not a number, but a relationship between two nodes pushing CAC down without looking at LTV can break the relationship even if CAC is "improving"

What to look at: the dashed line in the middle isn’t a flow edge—it doesn’t represent "the client moves from here to there." It represents a rule that must remain true. The red arrow below shows the classic mistake: CAC dropped (good in an isolated report), but the relationship with LTV broke because no one looked at both together.

📊 Other common business constraints

  • Payback period — how long it takes the CAC to pay for itself must be shorter than the available cash runway
  • Minimum retention — monthly churn below X% for projected LTV to meet the target
  • Margin over CAC — the first-month revenue must cover a fraction of CAC, or cash runs out before LTV is realized

Key concepts

Constraint ≠ metric

And a relationship between two

Needs both nodes

It won’t work unless both are visible

A single objective fails

Single-metric loop does not express

Misleading improvement

One number goes up, its counterpart breaks

4

🌳 Distinguish decomposition, dependency, and blocking

The team backlog has three different types of edges, and most tools only really show one of them. Decomposition: epic contains story contains task. Dependency: it needs to finish first. Block: prevents something else from starting until it’s resolved.

Only the first is a true hierarchy—each task has just one parent, and nothing loops back. The other two turn the tree into a graph: a task can depend on another task from a completely different epic, and a blocker can connect items with no relationship in the backlog's org chart.

🆕 New here? Typed edge

Typed edge: an edge that carries a label saying WHAT TYPE of relationship it represents—it’s not just “A connects to B,” it’s “A depends on B" or "A blocks B". Without the type, the graph becomes a meaningless jumble of lines.

Whiteboard-style diagram of a software project: an epic breaks down into Story A and Story B, which break down into tasks and subtasks. A red arrow goes from Task 2 to Task 3, labeled depends on. A blue arrow goes from Task 3 to Task 1, labeled blocks. A legend shows three edge types: decomposition in white, depends on in red, blocks in blue.
What to look at: the white tree (epic → stories → tasks) is predictable; any backlog tool can draw it automatically. What matters are the two colored arrows: they’re the only things that break the tree and show why Task 1, which seemed free, is actually blocked.
Edge type What it means Effect on parallelism
Decomposes An epic contains a story, a story contains a task — hierarchy, with only one parent None—it’s just organization; it doesn’t constrain execution order
Depends on Needs to finish before the next one starts Reduces—the dependent task becomes available only afterward
Blocks Prevents another from starting until it is resolved, even when they are not hierarchical Reduces and hides—it tends to span epics and is the hardest to see

Key concepts

Three edges

Decomposes, depends, blocks

Only one is a tree

Decomposition has a single parent

Two break the tree

Span different epics

Disappear from the org chart

Tool only draws the hierarchy

5

📐 Calculate how many workstreams can run now

With dependencies and blockers marked, you can count the level width: how many tasks are ready at the same time, with no pending dependencies. This is how you actually size a team or agents, instead of guessing “I’ll put five agents on this.”

🆕 New here? Level width and bottleneck

  • Level breadth: how many tasks are available at the same time on the same “level” of the dependency graph.
  • Bottleneck: the point in the system that limits how much the rest can move forward — even when everything around it has spare capacity.
level 1 — free now task A task B level 2 task C task D task E level 3 — bottleneck task F 2 → 3 → 1: the breadth funnel narrows again — F blocks everything that depends on it

What to look at: the width of each lane. Level 1 opens up two tasks, level 2 opens up three— up to this point, five agents or five people fit well. But level 3 opens up only a. If you put five agents to work and only one task is available at that level, the other four will sit idle or start getting in each other's way.

⚠️ Warning: spare capacity isn’t usable capacity

Having five agents available doesn’t mean five tasks will run in parallel. The dependency graph determines the actual width at any given moment—not the number of people or agents you hired. Measuring the level’s width before of allocating prevents you from placing resources where there’s nothing to do.

Key concepts

Level breadth

Tasks ready at the same time

Scales the team

Better than guessing a number

Bottleneck

A narrow level holds everything else up

Idle resource

Extra agents don't fix a bottleneck

6

🤖 Give the agent the graph to decide

With the business or backlog graph written out, an agent can propose an allocation, identify the bottleneck, and simulate the side effects of a change — "if I double the campaign budget, what happens to churn and LTV?". Without the graph, it only weighs in on the metric you mentioned — and goes back to the myopic loop from the start of the course.

🧪 Ready-to-use prompt: turn a business or backlog into a typed graph

Objective: give Claude Code a description of your funnel or an export of your backlog and get back a JSON graph with typed edges, plus the parallelism levels and the bottleneck.

Voce vai modelar <o funil de crescimento do meu produto> (ou: <o export do meu
backlog em CSV/JSON>) como um grafo. Regras:

1. Cada etapa/tarefa vira um NO com id curto.
2. Para negocio: arestas tipadas em "converte_em" (fluxo normal), "realimenta"
   (volta pra um no anterior, ex: churn -> campanha) e "restringe" (relacao
   entre duas metricas, ex: LTV/CAC > 3 — nao e fluxo, e regra).
3. Para backlog: arestas tipadas em "decompoe" (hierarquia, um pai so),
   "depende_de" (precisa terminar antes) e "bloqueia" (impede inicio,
   pode cruzar epicos diferentes).
4. Devolva em JSON: { "nos": [...], "arestas": [{"de","para","tipo"}] }.
5. Calcule e devolva tambem "niveis_paralelismo": lista de niveis com os
   nos liberados em cada um (sem dependencia pendente), e "gargalo": o
   nivel com menor largura.

Dados de entrada: <cole aqui a descricao do negocio ou o export do backlog>

How to verify: (1) if the JSON has NO "feeds back" (business) or "blocks" (backlog) edges, the model drew a straight pipeline, not a graph—ask again, insisting on loops and cross-connections. (2) Check whether the identified "bottleneck" matches the level the team already feels in practice—if the model points to a bottleneck no one recognizes, the graph probably has an incorrect dependency.

💡 What the graph gives you that a standalone metric does not

A number by itself only answers “did it go up or down.” A graph answers “what else moves when I change this” — and that’s the question that determines real allocation, budget, and priorities. It’s the same argument as in Track 3: the graph isn’t a fad, it’s the right format when the question involves more than one thing at a time.

Key concepts

Graph enables agent

Allocation, bottleneck, simulation

Without a graph, it’s just an unsupported opinion

Only talks about the metric mentioned

Typed prompt

Named edges, not just lines

Close the course

Return to the initial anchor phrase

Quick check (nothing is blocked): You asked the model to draw your growth funnel graph, and it returned just a straight line, from campaign to LTV, with no arrows going back. What should you do?

📌 Module Summary

✓
Funnel = state graph — each step is a node, each conversion is an edge.
✓
Feedback — churn and CAC loop back to the start, giving the system its own behavior.
✓
Constraint between metrics — LTV/CAC > 3 is a relationship, not a number; a single objective doesn’t express that.
✓
Decompose, depend, block — three different edges in the backlog; only the first is hierarchy.
✓
Level breadth — count how many tasks are available now before assigning people or agents.
✓
Graph enables the agent — with the graph written out, it proposes an allocation and simulates side effects; without it, it only gives opinions.

Next Module:

5.3 — Prompt library: build a graph from a process, turn it into an executable script, audit a graph, find collisions between loops.